Skip to main content

Keflavik DEL

Keflavik Delivery (BIKF_DEL) shall provide clearance delivery to departing IFR aircraft.

Overview of SIDs

All SIDs below require RNAV 1 capability.

TERMINATING FIX

RUNWAY

01

10

19

28

LUTER

2A

2B

3C

3D

OSKUM

3A

1B

3C

3D

PIXUM

1A

1B

2C

2D

RIMUM

1A

3B

1C

1D

DELES

2A

3B

2C

3D

SORIR

3A

3B

2C

2D

RALOV

3A

4B

3C

1D

Initial Climb: FL290 (or RFL if lower)

Omnidirectional Departures

Aircraft which are non-RNAV may be cleared on the Omnidirectional (OMNI) departures. There are four OMNI departures – one for each runway. These departures essentially have the aircraft fly runway track to 5000ft, after which they will proceed as instructed by ATC. The initial climb is 5000ft.

RWY

OMNI

TRK

01

4A

014

10

4B

104

19

4C

194

28

4D

284

When assigning an Omnidirectional departure, DEL shall notify APP (no prior approval from APP is required), and change the SID item in the Departure list to the appropriate OMNI SID, overriding Euroscope’s automatic SID selection.

An example of a clearance via an OMNI departure is as follows:

🎧 ICE9142, oceanic clearance to London Heathrow, via the OMNI 4A departure, OSKUM, VALDI, initial climb 5000ft, Mach .78, squawk 4301.

If the pilot appears unfamiliar with the OMNI departures, the alternative phraseology "climb straight ahead to 5000ft" may be used (in which case the initial climb may also be omitted.)

Standard Routings for Departures

Iceland AIP ENR 1.8.3.1.3.7 defines standard routing requirements for departures from BIKF. For ease of reference, they are summarized in the following images:

image.png

image.png

G3 Airway Restriction

For aircraft departing BIKF (and BIRK), the G3 airway is not available, except to aircraft with short-range navigational equipment only (e.g., VOR navigation.)

If an aircraft has filed a flight plan routing via G3, they should be rerouted as per the standard routings above.

Generally speaking, most aircraft can be rerouted from the last waypoint of their SID direct to either LUTER or PIXUM, followed by their final waypoint in the Reykjavik CTA.

For flights remaining in the Reykjavik CTA for their entire flight, such as those going to EKVG, the latter would be the final waypoint of their flight plan.

IFR Flights to BIRK

DEL shall coordinate all IFR flights from BIKF to BIRK prior to issuing the clearance. APP will provide either a direct to one of BIRK’s Initial Approach Fixes (IAFs), or radar vectors, depending on the traffic situation.

Such clearances follow the general format of non-standard clearances (see Delivery SOP page), for example:

🎧 ICE9302, cleared to Reykjavik, after departure runway 19 direct MIKVU, 5000ft, squawk 1371.

IFR Circuits/Crosswind Testing

In real life, BIKF is a common destination for aircraft manufacturers to test their aircraft’s heavy crosswind capabilities.

DEL must coordinate all such aircraft with APP prior to issuing any clearance. The flight may be issued a clearance with the clearance limit of “Keflavik,” specifying that the flight is performing IFR circuits (or crosswind testing), with any relevant departure instructions as coordinated with APP. For example:

🎧 BOE1, cleared to Keflavik, IFR circuits, after departure runway 19 climb straight ahead to 5000ft, squawk 1322.