Simplified CDM Procedures (APP/CTR)
Before you start, make sure CDM is started for your airport. See Starting CDM & handing over master.
Simplified CDM Procedures (Top-down by APP/CTR)
This part of CDM is known as ATFCM.
Simplified CDM procedures are done from the departure list. Please note that:
- You are allowed to use expanded CDM procedures if your capacity allows
- You MUST adhere to the displayed CTOT for take-off
- You may ignore TSATs for flights without a CTOT if workload is too heavy
Reference Material
Click the TSAT column header. This sorts the departure list by TSAT and makes it easier to manage.
Actions for simplified CDM procedures are the same as for expanded procedures, but with more freedom.
Your departure list now shows a TOBT, a TSAT and a CTOT.
TOBT shows the off-block time set by the pilot (or controller).
- TOBT: Light green when valid but not yet within the start-up window.
- TOBT: Dark green when within the start-up window.
- TSAT: Light green when valid but not yet within the start-up window.
- TSAT: Dark green when within the start-up window.
- TSAT: Yellow when about to expire (TSAT+4 to +5).
- TSAT is blank once it has expired.
- CTOT: Green, Orange or Red depending on the type of restriction causing the CTOT.
Procedures
Aircraft calls for ATC clearance
If a CTOT is present: advise the pilot of the CTOT with the clearance. You MUST then adhere to the TSAT.
If there is no CTOT: no further action is required at this stage.
Aircraft calls for start-up/pushback
- If the pilot is ready earlier than their TOBT, use Ready TOBT (right-click the TOBT).
- Click ASRT to record that the pilot has requested start-up.
If a CTOT is present:
- Adhere to the displayed TSAT. If the TSAT is not yet within the start-up window (light green), the pilot must wait.
- When the TSAT is within the start-up window (dark green, +/- 5 min), start-up can be approved.
If no CTOT is present:
- Start-up and pushback can be approved regardless of TSAT (simplified procedures only).
- Be aware that ignoring TSATs may lead to longer waiting times at the runway.
When start-up is approved, set the status to STUP or PUSH. This records the ASAT.
