Expanded CDM Procedures (TWR/GND/DEL)
These procedures are for DEL, GND and TWR. Follow them in full unless traffic is very light. A CTOT must always be followed.
Start CDM for the airport first. See Starting CDM & handing over master.
BIRD runs CDM with real mode off. The EOBT is never copied into the TOBT, so a flight has no TSAT until the pilot sets a TOBT on the VDGS or you set one. Getting the TOBT is part of every clearance.
The lists
DEL and GND work from the start-up list; TWR may use the departure list. Click the TSAT header to sort by start-up time.
| Column | What it shows | Click to |
|---|---|---|
| EOBT | Filed off-block time | Edit EOBT |
| TOBT | Target off-block time | Edit TOBT, or Ready TOBT (sets it to now) |
| TSAT | Start-up time | Calculated, no action |
| TTOT | Take-off time | Calculated, no action |
| CTOT | Slot | Set or remove a manual CTOT (master only) |
| TSAC | The TSAT you gave the pilot | Set it to the current TSAT |
| ASRT / READY | Pilot has called ready | Set or clear ASRT |
| ASAT | Start-up approved | Set by STUP/PUSH |
Colours
| Column | Colour | Meaning |
|---|---|---|
| TOBT | Light green / dark green | Before / after EOBT-5 |
| TOBT | Yellow | Last minute before the TOBT expires |
| EOBT | Orange | Pilot has changed the EOBT and it differs from the TOBT |
| TSAT | Light green | Valid, not yet in the window: the pilot must wait |
| TSAT | Dark green | In the window (TSAT ±5): start-up can be approved |
| TSAT | Yellow | TSAT+5 to +6: approve now or it expires |
| TSAT | Blank | No TOBT, or cancelled: a new TOBT is needed |
| TSAC | Orange | The TSAT has moved more than 5 minutes from what you gave the pilot |
| CTOT | Green / Red / Orange | Network slot / flow or capacity slot / manual or event slot |
Delivery
- Check the TOBT.
- Set on the VDGS and still valid: use it.
- Missing or clearly wrong: ask for it and enter it with Edit TOBT.
- Pilot ready now: use Ready TOBT.
- Wait up to 10 seconds for the TSAT. Check the CTOT column and, if there is a slot, the FLOW column for the regulation.
- Give the clearance with the slot (if any) and the start-up time, then click TSAC.
- When the pilot calls ready, click ASRT.
- When the TSAT turns dark green, transfer to Ground.
During events with a slot file, the slot shows in the event slot column. Use Add Event CTOT as MAN CTOT to apply it. Do not use the old VATCAN Bookings SLOT column.
Ground
- TSAT dark green: approve start-up or push. Set STUP or PUSH to record the ASAT.
- TSAT light green: the pilot is early. Set ASRT if not already set, try Ready TOBT for an earlier TSAT, then give the start-up time and ask them to call back.
- TSAT blank: the times were cancelled. If the pilot is ready now, use Ready TOBT and give the new TSAT. Otherwise ask them to update the TOBT on the VDGS.
- With a CTOT: time the taxi so the aircraft reaches the holding point inside the slot window.
Tower
- Take-off must be within CTOT -5/+10. Do not clear an aircraft for take-off more than 5 minutes before its CTOT.
- If an MDI is active, keep the interval between airborne times. You may clear an aircraft slightly early to meet it.
- During radar release periods, get an APP release for each departure before take-off clearance.
Missed slots
| Situation | Action |
|---|---|
| Will miss by up to 10 minutes, flight plan active | CTOT options → EXTEND (+10 minutes, once only) |
| Will miss by more | Use Ready TOBT or the Network Status REA option. vIFF issues a new CTOT. |
| Manual or event slot | The CDM master sets a new manual CTOT |
| CTOT has changed | Pass the new slot to the pilot: "revised slot ..." |
For phraseology, see CDM phraseology.